Abstract:Taking the storage reservoir of a power station as an example, the links involved in the construction stage and the technical essentials of each link are briefly discussed when the acid aggregate hydraulic asphalt concrete material is applied in the anti-seepage face slab project of reservoir. Aiming at the project requirements of this reservoir, the construction scheme conforming to the actual situation is proposed.