基于MIKE21的入河排污口设置论证实例分析
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    开展即将开发的城镇区内城镇污水处理厂入河排污口设置论证,分析污水处理厂建设对片区现状及未来水环境的影响,能够给合理开发利用和有效保护水资源、维护经济社会健康发展提供技术支持。以南京龙袍新城污水处理厂(一期)工程入河排污口设置论证为实例,选取COD和NH3-N做为评价因子,采用二维水量水质模型进行河段水质预测,分析污染物排放对相关水域水质及水生态的影响,论证排污口选址合理性分析。

    Abstract:

    To carry out the demonstration of setting up the sewage outlet into the river of the urban sewage treatment plant in the urban area to be developed, and analyze the influence of the construction of the sewage treatment plant on the current situation of the area and the future water environment, can provide technical support for the rational development and utilization and effective protection of water resources, and maintain the healthy development of economic society. Taking the demonstration of the installation of sewage outlet into the river of Nanjing Longpao New City Sewage Treatment Plant (Phase I) project as an example, COD and NH3-N are selected as evaluation factors, and two-dimensional water quantity and quality model is adopted to predict river water quality, analyze the impact of pollutant discharge on water quality and water ecology of relevant waters, and demonstrate the rationality of the location of sewage outlet.

    参考文献
    相似文献
    引证文献
引用本文

侯盼,王洁,邓人超,谢心白.基于MIKE21的入河排污口设置论证实例分析[J].城市道桥与防洪,2022,(11):133-137,167.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2022-07-20
  • 最后修改日期:2022-08-09
  • 录用日期:2022-08-11
  • 在线发布日期: 2022-11-20
  • 出版日期:
关闭