    摘要:

    在工程项目推进的不同阶段中,从初步设计阶段的概算定额到施工阶段的预算定额工程定额。对项目的投资控制扮演着不可或缺的作用。随着“四新技术”的不断发展,政府部门颁布的定额内容难免有所缺失,为保证计价依据的规范性、合理性,政府部门根据需要,及时编制了一系列临时定额。本项目主,要阐述了DN3000JPCCP顶管临时定额编制背景和造价水平,并以之与现有定额水平下其他管材的顶管进行对比,分析临时定额的必要性、适用性和合理性。

    Abstract:

    SIn the different stages of project promotion, from the budget quota in the preliminary design stage to the budget quota in the construction stage. The investment control of the project plays an indispensable role. With the continuous development of "four new technologies", the content of quota issued by government departments is inevitably missing. In order to ensure the standardization and rationality of pricing basis, government departments have timely prepared a series of temporary quotas as needed. The main purpose of this project is to describe the background and cost level of dn3000jpccp pipe jacking temporary quota, compare it with the pipe jacking of other pipes under the existing quota level, and analyze the necessity, applicability and rationality of the temporary quota.

    参考文献
    相似文献
    引证文献
引用本文

王丽君,黄英,林昭娣. DN3000JPCCP顶管临时定额动态管理[J].城市道桥与防洪,2022,(7):243-246.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2022-03-21
  • 最后修改日期:2022-03-28
  • 录用日期:2022-05-03
  • 在线发布日期: 2022-07-21
  • 出版日期:
关闭