    摘要:

    广东省汕头市潮阳区纺织印染环保综合处理中心污水处理厂经处理达标的尾水,最终通过压力管道排入广澳湾海域。该排海管道海域段长1021m,采用DN800~DN1000实壁PE管、法兰连接。考虑工程实际情况,通过选择合适的管材及接口、破波区采用钢板桩支护后开槽敷设、深水区采用铺管船法敷设等措施,确保设计方案安全可靠。施工过程中重点对沟槽开挖、海上运输、配重块设置、下沉敷设进行控制,并制定防台风、防船舶碰撞、防雾等应急方案,保证了工程安全实施。

    Abstract:

    The treated tail water of the sewage treatment plant of the textile printing and dyeing environmental protection comprehensive treatment center in Chaoyang District, Shantou City, Guangdong Province is finally discharged into the sea area of Guang"ao bay through the penstock. The sea area section of the sea drainage pipeline is 1021m long and is connected with DN800 ~ DN1000 solid wall PE pipe and flange. Considering the actual situation of the project, the safety and reliability of the design scheme were ensured by selecting appropriate pipes and interfaces, slotting laying after steel sheet pile support in the wave breaking area, and pipe laying ship method in deep water area. During the construction process, the trench excavation, marine transportation, counterweight setting and sinking laying were mainly controlled, and emergency plans such as typhoon prevention, ship collision prevention and anti fog were formulated to ensure the safe implementation of the project.

    参考文献
    相似文献
    引证文献
引用本文

高法启,洪莫添,魏斌,杨涛,黄建波.污水处理达标后尾水排海工程实践[J].城市道桥与防洪,2022,(11):141-144.