SThe steel box tied arch of the main bridge of this project is installed on water, and the construction site is located at the mouth of the river. In order to ensure the smooth construction of this area and the traffic safety of the navigable channel, the installation is carried out by cross-channel off-site assembly and jacking construction. The article mainly describes its construction technology, which has certain guiding significance for the construction of similar projects.