Abstract:On the basis of municipal engineering in Shanghai in the last decade, the project design of the urban bridge layout which is related to subway is summarized. Settlement displacement calculated and safety requirement on rail transit met with, the safety clearance between the pile foundations for newly-built urban bridges and the subway shields are determined, and then the cross sections of the bridges have been laid out reasonably, pile foundations have been arranged reasonably and the superstrcture and substrcture form has been chosen reasonably.