木桩上浮现象的分析及处理方法探讨
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    木桩基础属挤压桩范畴,水利工程密排木桩结构施工中,因挤土效应和超静孔隙水压力等原因,在淤泥土层较厚的河段存会出现上浮、倾斜的情况,本文结合上海某水利工程实例,从优化设计和改进施工工艺两方面提出控制的措施,可有效解决木桩上浮问题,为上海等软土地区其他类似工程提供参考。

    Abstract:

    Wooden pile foundations belong to the category of squeezed piles. In the construction of close-packed wooden pile structures in water conservancy projects, due to soil squeezing effect and excess pore water pressure, there will be floating and tilting in river sections with thick silt soil. Based on an example of a water conservancy project in Shanghai, this article proposes control measures from two aspects: optimized design and improved construction technology, which can effectively solve the problem of wooden pile floating and provide a reference for other similar projects in soft soil areas such as Shanghai.

    参考文献
    相似文献
    引证文献
引用本文

穆方方.木桩上浮现象的分析及处理方法探讨[J].城市道桥与防洪,2022,(7):147-149.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2021-11-18
  • 最后修改日期:2021-12-13
  • 录用日期:2021-12-26
  • 在线发布日期: 2022-07-21
  • 出版日期:
关闭