Abstract:In the process of bridge construction, the selection of reasonable construction scheme is to achieve the design intention, ensure the safety of construction, the key factor to achieve the construction objectives. In this paper, the installation scheme of the main span of a flying swallow steel arch bridge is taken as the research object, combined with the characteristics of the bridge structure and the actual construction conditions, through the comparative analysis of three different installation schemes, the reasonable construction scheme is determined.