Abstract:As one of the first projects designed and constructed according to the newly standard for pollution control on the hazardous waste landfill,Yancheng Funing concrete landfills has operated for about two years,After the post evaluation, This short paper is presented to show that the good design can effectively guide the project operation in the aspects of landfill operation mode, canopy form, landfill liner system, leachate drainage system and other process design. The successful project can provide reference for the design and operation of concrete landfill in the future.