Abstract:According to the characteristics of the Wuhan deep tunnel project, referring to the existing similar engineering experience at home and abroad, combining the engineering geology, the main risk sources and control factors of each section, the comparison and selection of the construction methods of the whole line are studied, and the suitable method for this project is comprehensively proposed. The segmented construction method has certain reference significance for similar projects.