Abstract:Aiming at the areal tunnel of Danyang Road Station - Changyi Road Station of Shanghai Metro Line 18, the reasons of the segment floating to cause the segment crazing and segment leakage during the shield tunneling in the confined water-bearing stratum are analyzed. The technical measures and methods to solve the above problems are put forward, which can provide some reference and experience for the shield tunneling in the confined water-bearing stratum.