Abstract:Based on the analysis of the current situation of the revetment of the upper reaches of Kuihe River in Xuzhou City, the necessity of reinforcement and reconstruction of the existing revetment, and the key points and difficulties in its design are concluded. Through the targeted design, the revetment reinforcement and reconstruction scheme is proposed, and the design is further optimized according to the calculation and review of the scheme. Finally, a kind of revetment reinforcement and reconstruction measures is obtained, which can not only achieve the goal of improving water safety and water landscape, but also meet the site construction conditions and minimize the impact on the existing structures. The scheme and its research process have a certain reference value for similar projects.