预制桥墩存储期间裂缝变形控制技术研究
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    为研究预制桥墩存储期间的裂缝变形状况,以312国道某扩建桥梁为工程背景,采用有限元法建立预制桥墩实体模型进行静力分析,研究存储期间不同影响因素对其受力性能和位移变形的影响。结果表明:预制桥墩水平存储期间,支撑布置在正负弯矩相等处、叠放层数为一层可避免预制桥墩在自重荷载及下部支撑作用下产生裂缝和变形。研究得出的控制指标将对预制桥墩的工程应用有一定指导作用。

    Abstract:

    In order to study the cracks and deformations of precast piers during storage, the 312 National Highway extension bridge was used as the engineering background, and the finite element method was used to establish a physical model of the precast piers for static analysis. The effects of different influencing factors on the mechanical performance and displacement deformation during storage were studied. influences. The results show that during the horizontal storage of the precast piers, the supports are arranged at the same positive and negative bending moments and the number of layers is one layer to avoid cracks and deformations of the precast piers under the load of its own weight and the lower supports. The control index obtained by the research will have a certain guiding effect on the engineering application of precast bridge piers.

    参考文献
    相似文献
    引证文献
引用本文

张基成,陈欣,闫畅,冯晓楠,删除.预制桥墩存储期间裂缝变形控制技术研究[J].城市道桥与防洪,2022,(7):128-131.