Abstract:On the river where shipping service cannot be suspended, partitioned cofferdam method is used to rapidly reconstruct and expand the simply-supported prefabricated beam bridge to meet the needs of transportation and flood control. At the same time, the original pipeline will be relocated, displaced and protected. Newly constructed bridges with higher vehicle load capacity require foundation treatment and protection behind the abutment.