Abstract:By analyzing the stress state of a long-span prestressed concrete continuous beam in the process of jacking, the principle of beam jacking, the construction control principle and method in the process of beam jacking are expounded, the safety of jacking beam, spike and rail is simulated and calculated, and the targeted monitoring measures are put forward so as to provide basis for ensuring bridge safety.